Radial Renewable Energy Park at Yarram Sawmill

GridEdge is currently involved in a project to create a Renewable Energy Park at the Radial Timbers Sawmill in Yarram.

The project will establish a “Bioenergy Cell” that incorporates the GridEdge SoNick Battery Energy Storage System (BESS) and The Earth Systems Charmaker Pyrolysis Unit and solar installations.

Stage 1 of the Renewable Energy will be the installation of 2 installations of 100kW solar & 90 kWh battery storage on each of the 2 mills at Radial timber.

The battery installations are using 4 x 620V SoNick batteries in a SoNick Zebra container. Each battery installation is supported by an ELPower 100 KW PCS (power conditioning system).

Continue reading “Radial Renewable Energy Park at Yarram Sawmill”

SoNick – the ESG battery

ESG (Environmental, Social, and Governance) is a term that is often used by ethical investors to evaluate a company’s sustainable and ethical performance when they are investigating the long term investability of a company.

A crucial part of our new energy transition is the usage of batteries to store energy, either as backup power, to stabilize the grid or in EV’s. This transition will involve trade-offs and by adhering to ESG principles companies can make sure their governance covers factors that make sure that the net result of this transition is positive from the environment and social angles.

Continue reading “SoNick – the ESG battery”