GridEdge is currently involved in a project to create a Renewable Energy Park at the Radial Timbers Sawmill in Yarram.
The project will establish a “Bioenergy Cell” that incorporates the GridEdge SoNick Battery Energy Storage System (BESS) and The Earth Systems Charmaker Pyrolysis Unit and solar installations.
Stage 1 of the Renewable Energy will be the installation of 2 installations of 100kW solar & 90 kWh battery storage on each of the 2 mills at Radial timber.
The battery installations are using 4 x 620V SoNick batteries in a SoNick Zebra container. Each battery installation is supported by an ELPower 100 KW PCS (power conditioning system).